The required article for this week is Article 8, Schedule Delay Analysis, by George R. Stumpf. It is an overview of delay analysis methods. You may find some parts of the article technical. Check on Article 7 for basic concepts. It is similar to Article 8 but shorter and simpler because “smoke and mirrors” are eliminated. Article 2 is also an overview of delay analysis methods, a little dated, but still a good article. For the most recent development in methods and terminologies on delay analysis, read Article 9.
Most other articles are on construction claim, including Articles 1, 3, 5, and 6. Article 4 is a summary of an academic study. Article 10 sheds some light on the connection between 4D models and delay analysis.
- Minimizing Costs of Delay Construction Claims, Dwight A. Zink, AACE Transactions, 1987
- Delay Analysis - Issues Not for Granted, George E. Baram, CCE, AACE Transactions, 1994
- Claims prevention: Offense versus defense, James Zack, AACE International Transactions, 1996
- Construction Documentation Used as Indicators of Delays, Hala Elnagar; Janet K. Yates, Cost Engineering, Vol. 39, No. 08, 1997
- How to lose money negotiating a construction claim, Michael Just; Torone,Brian, AACE International Transactions, 1997
- Delay damages-some owner defenses, James Zack, AACE International Transactions, 1998
- Delay Analysis - Eliminating the Smoke and Mirrors, Eric Z. Fruchtman, AACE International Transactions, 2000
- Schedule Delay Analysis, George R. Stumpf, PE, Cost Engineering , 2000
- Current Delay Analysis Techniques and Improvements, Satish Mohan; Khalid Al-Gahtani, Cost Engineering; 2006
- Leveraging the Power of 4D Models for Analyzing and Presenting CPM Schedule Delay Analyses, Kevin Coyne, AACE International Transactions, 2008